Rear Extension, Cherry Hinton
Single-storey rear extension with bi-fold doors and a matched brick tie-in to the original 1930s semi.
Dormer Loft Conversion, Trumpington
L-shaped dormer conversion adding two bedrooms and an en-suite, with a relocated staircase.
Period Renovation, Chesterton
Full internal refurbishment of a Victorian terrace, retaining cornicing and original fireplaces.
Foundations & Drainage, Milton
Excavation, soakaway drainage and reinforced concrete footings ahead of a two-storey extension.
Infill New Build, Fen Ditton
Three-bedroom infill new build managed from planning drawings through to warranty handover.
Side-Return Extension, Romsey
Side-return kitchen extension with structural glazing and a steel-framed opening to the garden.
School Hall Refurbishment, Coton
Structural repairs and a full internal refit of a primary school assembly hall over the summer term.
Estate Maintenance Contract, Duxford
Rolling roofing and brickwork repointing contract across a six-building estate.
Hip-to-Gable Loft, Arbury
Hip-to-gable conversion with a rear dormer, adding a principal bedroom suite.
Kitchen & Bathroom Refit, Newnham
Full strip-out and refit of kitchen and two bathrooms, including new first-fix plumbing and wiring.
Retaining Wall & Access, Girton
Reinforced retaining wall and regraded driveway access ahead of a new build plot.
Self-Build Home, Histon
Four-bedroom self-build managed end to end, from groundworks through to a 10-year structural warranty.
Restaurant Refit, Perne Road
The Dumpling Tree — full refit of a dilapidated building on a £400k budget, including tarmac surfacing, composite cladding, patio restoration, dwarf walling and a pergola to open up the frontage.
Shop Fit, Hotter Shoes
Retail shop fitting for Hotter Shoes, including first and second fix carpentry, painting and decorating, completed around the store’s trading hours.